Telco Access to Your Building?

Apartment owners may receive letters from telecommunications providers requesting access to install broadband infrastructure. If your body corporate receives one, respond promptly, check the proposal carefully and avoid assuming the provider has authority.

The Queensland guidance available for body corporate issues does not determine Commonwealth telecommunications access rights. It does explain how to investigate common property, records, proposed improvements and internal dispute processes.

Can a telco access my apartment building?

The answer depends on the proposed work, the property involved and the telecommunications laws that apply to the provider’s request. The sources available for this article do not establish whether a provider can enter your building, what notice it must give or what objection rights may apply.

A letter does not automatically give the provider permission to enter. Do not ignore it or obstruct access without first obtaining advice. Ask the provider to identify:

  • the company making the request
  • the work proposed
  • the areas the provider wants to access
  • the equipment and cabling involved
  • the dates and expected duration of the work
  • the legal basis for the request
  • the contact person managing the project.

The body corporate should keep the original correspondence and record when it was received. If the request refers to a notice, deadline or objection process, obtain advice about that process promptly.

It is also useful to confirm which legislation applies to your body corporate. Most Queensland bodies corporate with a community management statement are regulated under the Body Corporate and Community Management Act 1997, but other Acts apply to some bodies corporate. Titles Queensland can confirm the legislation applying to your scheme.

For related information, see our guide to entry rights in a community titles scheme.

What should a body corporate check in an access notice?

Start by comparing the proposal with your scheme’s survey plan, community management statement, building plans and existing service arrangements. The survey plan helps identify the boundaries between lots and common property. Knowing those boundaries is an important first step when working out who is responsible for an area.

The committee or body corporate should check whether the proposed route crosses:

  • common property
  • a lot
  • shared plant rooms, risers or service cupboards
  • fire safety equipment or access paths
  • membranes, roofs, walls or other areas that could be affected by drilling or fixing equipment
  • existing electrical, plumbing or communications services.

Ask for a marked-up plan showing the proposed route, equipment locations, fixing points and access requirements. Request details of the installers and any contractors they will use. If the proposal is unclear, ask for further information before deciding how to respond.

The body corporate should also search its records for previous approvals, plans, correspondence, warranties and service arrangements. Owners and other eligible people can request access to body corporate records in writing, usually by identifying the documents sought and paying the applicable fee.

A body corporate must generally allow an eligible person to inspect records or receive copies within 7 days after receiving a written request and the required fee. Committee members must have reasonable access to inspect records at no cost.

The records may show whether another provider has already installed infrastructure, whether access routes have restrictions, or whether previous work caused damage. This information can help the committee ask focused questions and avoid approving a proposal that conflicts with existing services.

You can read more about planning and protecting utility infrastructure.

What risks can telecommunications work create for common property?

Telecommunications work may affect building membranes, structural elements, architectural finishes or existing services. It may also damage common property during installation or removal. These are project risks to investigate rather than automatic consequences of every installation.

Before work begins, consider obtaining advice from a suitably qualified building, engineering, electrical or fire-safety professional if the proposal affects specialist areas. Ask the provider to explain how it will protect the building and existing services.

The body corporate is responsible for maintaining common property in good and structurally sound condition. Maintenance can include work needed to prevent damage. An owner may be liable where poor maintenance of a lot causes damage to another lot or common property, and the body corporate may be liable where poor common-property maintenance causes damage to a lot.

Document the condition of affected areas before work starts. Take photographs, retain relevant plans and record any existing defects. Ask who will inspect the work afterwards and how damage will be reported and repaired.

The committee should also consider whether the installation could:

  • interfere with waterproofing or drainage
  • block access to existing services
  • affect fire safety equipment or escape routes
  • create unreasonable noise or disruption
  • alter the appearance of common property
  • make future maintenance more difficult.

A new installation may be an improvement rather than maintenance. Queensland guidance describes an improvement as including a structural or non-structural change, such as installing air conditioning. The distinction can be difficult, so seek advice before treating the proposal as a routine maintenance matter.

Can the body corporate set conditions for the work?

The body corporate can ask the provider to negotiate practical protections for the building. These requests might include detailed plans, competent and appropriately qualified installers, agreed working hours, protection for common property, supervision, insurance information, reinstatement arrangements and security against accidental damage.

Present these as conditions or safeguards the body corporate wants to negotiate, rather than guaranteed rights or obligations of the provider. The telecommunications access regime may limit what the body corporate can require, so obtain advice before refusing access because a requested condition has not been accepted.

If the proposal involves the body corporate approving an improvement to common property, the required approval depends on the cost and the regulation module applying to the scheme. For schemes under the Standard, Accommodation and Small Schemes Modules, the approval may be by committee resolution, ordinary resolution or special resolution depending on the project cost.

The body corporate should not assume that a provider’s installation is the same as a body corporate improvement. Ask a qualified adviser to consider the proposed work, the access request and any approval requirements together.

Put all agreed protections in writing. The written arrangement should identify the approved route, equipment, access dates, reinstatement standard and process for reporting damage. Keep a copy with the body corporate records.

What should you do if you disagree with the proposed installation?

Respond in writing and explain the specific concerns. Avoid general objections such as not wanting the provider in the building. Instead, identify issues such as an unclear route, possible damage to a membrane, interference with existing services, missing technical information or an unreasonable access proposal.

Ask the provider to pause any planned work while the body corporate obtains the information it needs, if appropriate. Check the notice and obtain advice before promising access, refusing access or agreeing to conditions.

The committee may need to consider a written motion. When contacting the committee or body corporate manager, describe each issue briefly and state the specific motion the committee is being asked to vote on.

Keep copies of every letter, email, plan, photograph and meeting record. A clear written record will help the body corporate explain its position and show what steps it has taken.

Queensland body corporate disputes generally require the parties to attempt self-resolution before taking further dispute resolution steps. Self-resolution can include communicating in writing, presenting a motion to the committee or presenting a motion to a general meeting.

If the committee cannot decide the issue, a motion may need to go to a general meeting. Under the BCCM Act, a committee must generally vote on a motion within 6 weeks, unless it has notified the owner that it needs up to an additional 6 weeks. That timeframe may not suit a telecommunications request with an external deadline, so obtain advice about how to manage the timing.

If self-resolution fails, conciliation may be available for a dispute under the BCCM Act. You will generally need to show that you tried to resolve the issue before applying.

You can also read about damage to property through the Commissioner’s Office.

When should you seek legal or technical advice?

Seek advice early where the request:

  • includes a deadline or proposed access date
  • refers to Commonwealth telecommunications powers
  • proposes work on a roof, wall, membrane or structural element
  • affects fire safety, electrical systems or existing services
  • requires access through lots or secured areas
  • does not include a clear plan
  • may cause damage or require reinstatement
  • is disputed by an owner, occupier or committee member.

Your body corporate manager can help organise records, motions and communication with the provider. A lawyer can review the access request and explain any relevant rights or obligations. A qualified technical expert can assess the proposed route, building impacts and reinstatement requirements.

A prompt, documented response helps the body corporate investigate the request without unnecessarily obstructing the project. If you receive a telecommunications access notice, contact our team at reception@stratacare.com.au for help coordinating the next steps.

How Can We Help You?

Call us on 07 3435 5300 and one of our friendly consultants will help